Raising the roof on the Aquatics Centre
March 31st, 2009
Work has started to lift the 2,800-tonne wave-shaped roof of the Aquatics Centre into position. The lift is considered one of the most complex engineering and construction challenges of the Olympic Park ‘big build’.